Navigate slides
01

Investor Presentation — March 2026

Prepared for Matthias Frandsen

NEW MINING

U.S.-Based ASIC Mining Hosting
North Dakota & Minnesota

new-mining.co
new-mining.co Confidential — March 2026
02

About Us

  • Turnkey ASIC mining hosting across the northern U.S.
  • 5 operational sites in North Dakota & Minnesota
  • 30 MW+ combined electrical capacity
  • 24/7 monitoring, passive cooling systems
  • UL-certified mining containers
Mining containers with power transformer
Mining containers & power delivery
new-mining.co Confidential — March 2026
03

Market Opportunity

“Buy when there is blood in the streets.”
  • ASIC equipment prices at historic lows — up to 60% below peak
  • Market downturn = optimal deployment window
  • Hosting capacity consolidating among top operators
  • Difficulty growth slowing — favorable unit economics
BEST TIME TO DEPLOY
Lowest cost basis since 2020

Market Indicators

ASIC Prices
-60%
Hosting Capacity
-40%
Difficulty Growth
-25%
Full facility panorama
Operational mining facility
new-mining.co Confidential — March 2026
04

Option A: All Equipment

$10M
100% allocated to ASIC miners
3,000
Antminer S21 XP units @ ~$3,333 each
~11 MW
Total power consumption
$0.065
/kWh — all-inclusive hosting rate
ASIC miners running with indicator lights

Annual Mining (BTC ~$85K)

Revenue / miner $8/day = $2,920/yr
Electricity / miner 3.58 kW × $0.065 = $2,039/yr
Net / miner / yr ~$881

2-Year Exit Model (sell equip. at 2x)

2-year mining net $2.6M × 2 = $5.3M
Equipment sale (2x) 3,000 × $6.7K = $20M
Total 2-year return $25.3M
Net profit on $10M +$15.3M (153% ROI)
new-mining.co Confidential — March 2026
05

Option B: Equipment + Infrastructure

$7.5M
75% to ASIC miners
$2.5M
25% to transformers, cables, containers
2,250
Antminer S21 XP units @ ~$3,333 each
$0.049
/kWh — reduced hosting rate
Containers with transformer

Annual Mining (BTC ~$85K)

Revenue / miner $8/day = $2,920/yr
Electricity / miner 3.58 kW × $0.049 = $1,537/yr
Net / miner / yr ~$1,383 +57% vs A

2-Year Exit Model (sell equip. at 2x)

2-year mining net $3.1M × 2 = $6.2M
Equipment sale (2x) 2,250 × $6.7K = $15M
Infrastructure (+50%) $2.5M → $3.75M
Total 2-year return $25M
Net profit on $10M +$15M (150% ROI)
new-mining.co Confidential — March 2026
06

Investment Comparison

Metric Option A Option B
Investment $10M equipment $7.5M equip + $2.5M infra
Miners 3,000 S21 XP 2,250 S21 XP
Hosting Rate $0.065/kWh $0.049/kWh
Net / Miner / yr $881 $1,383
Annual Net ~$2.6M ~$3.1M
2-yr Mining Net $5.3M $6.2M
Equip. Sale (2x) $20M $15M
Infra Value (+50%) $3.75M
Total 2-yr Return $25.3M $25M

2-Year Total Return

$25.3M
Option A
$25M
Option B
OPTION A — MAX UPSIDE
More miners = higher exit value if equipment prices rise beyond 2x. Pure hosting model with no infrastructure obligations. Best for aggressive bull market bets.
OPTION B — DOWNSIDE PROTECTION
Own infrastructure shields from hosting rate volatility. Higher cash flow per miner ($1,383 vs $881). Tangible asset base even if equipment depreciates.
new-mining.co Confidential — March 2026
07
● North Dakota

Grand Forks

  • 6x Upstream Data 20" mining containers
  • Fully operational & UL certified
  • Snow protection enclosures installed
  • Dedicated power infrastructure
  • 24/7 remote monitoring active
OPERATIONAL
Fully deployed & generating revenue
Grand Forks facility panorama
Grand Forks, ND — Facility Panorama
new-mining.co Confidential — March 2026
08
● Minnesota

Moorhead

  • 4x mining containers deployed
  • Running & fully operational
  • LAN connected, centralized management
  • Stable grid connection with redundancy
  • Optimized airflow & passive cooling
OPERATIONAL
Stable production since deployment
Moorhead facility panorama
Moorhead, MN — Facility Panorama
new-mining.co Confidential — March 2026
09
● Minnesota

Bemidji

Scribner Site

  • 6x passive-cooled mining containers
  • 240 ASIC slots per container
  • Single phase PDU infrastructure
  • Fully operational

Puposky Site

  • 4 MW capacity available
  • C19 cable infrastructure
  • Passive cooling design
  • Expansion-ready
Upstream Data branded container Bemidji Puposky facility exterior Bemidji Scribner power substation
2 SITES — 4 MW+ CAPACITY
Passive cooling • 240 slots/container • C19 cables
new-mining.co Confidential — March 2026
10
● North Dakota

Langdon

  • 10–15 MW capacity available
  • 3-month build timeline from commitment
  • 95% target uptime SLA
  • Dedicated substation on-site
  • Land available for expansion
EXPANSION READY
10–15 MW • 3-month build • 95% uptime
Langdon power substation entrance Langdon site with available land
new-mining.co Confidential — March 2026
11

Infrastructure

  • Custom-built mining containers — UL certified
  • Passive cooling systems for northern climates
  • Dedicated substations per site
  • Redundant network connectivity
  • 24/7 remote monitoring & alerting
  • Rapid deployment — plug-and-play design
Dedicated power substation UL-certified mining container
new-mining.co Confidential — March 2026
12

Investment Structure

$10M Total Commitment

$5M
Upfront — at signing
$5M
Deployed over 3 months
$10M
Total investment

Deployment Timeline

Signing$5M upfront
Month 1Equipment orders
Month 2Installation begins
Month 3Full deployment
Month 4+Revenue generation
Structured deployment minimizes risk • Phased capital allocation • Revenue within 90 days
new-mining.co Confidential — March 2026
13

Why ND & MN

Strategic advantages of the northern U.S.

Low Energy

Among the lowest electricity rates in the U.S. — critical for mining margins

Cold Climate

Natural cooling 8+ months/year reduces OPEX & extends hardware life

Grid Capacity

Abundant grid capacity with minimal congestion — reliable 24/7 power

🏢

Pro-Business

Favorable regulatory environment, low taxes, streamlined permitting

🔒

Security

Low crime, rural locations, dedicated facilities with 24/7 monitoring

🇺🇸

U.S. Jurisdiction

Full legal protection, transparent operations, institutional-grade compliance

new-mining.co Confidential — March 2026
14

Next Steps

LET'S BUILD

Secure your position in U.S.-based mining infrastructure.
Let's discuss the right option for your portfolio.

Visit new-mining.co →

Contact Us

info@new-mining.co • new-mining.co

NEW MINING — Powering the future of Bitcoin
new-mining.co Confidential — March 2026